Flexible deployment for different healthcare settings

A secure local gateway model supports individual sites, distributed organisations and carefully assessed temporary or mobile environments.

01

Single-site clinic

A local gateway connects imaging equipment to the clinical systems used by one site.

02

Multi-site organisation

Repeatable gateway patterns support consistent workflows and central monitoring across locations.

03

Temporary clinic

A phased deployment can support time-bounded services while preserving controlled connectivity.

04

Mobile healthcare environment

Portable operating models can connect approved equipment where suitable local connectivity exists.

The local gateway remains the deployment anchor

Whatever the operating model, the gateway controls the path from imaging equipment to approved systems.

Imaging equipment Ultrasound · X-ray · CT · MRI
Secure Dicomora Gateway On-site · Controlled · Auditable
Encrypted connectivity Authorised integration paths
Clinical applications EPR · ERP · Portal · PACS
Medical imaging studies pass through a secure on-site Dicomora Gateway before controlled encrypted connectivity reaches authorised clinical applications.

A phased deployment approach

1. Discover

Confirm modalities, DICOM workflows, applications, sites, network boundaries and operational ownership.

2. Design

Define the gateway placement, integration routes, access model, monitoring and acceptance criteria.

3. Validate

Test approved workflows in a controlled environment before operational use.

4. Roll out

Introduce sites and equipment in agreed phases, retaining a clear rollback path.

5. Monitor

Use central visibility and UK support to identify and address operational exceptions.

Modernise your medical imaging workflow

Discuss your equipment, clinical systems and deployment model with the Dicomora integration team.

Arrange a Consultation